Duke Energy Queensgate Chiller Replacement

Cincinnati, Ohio 

Construction Duration
5 months

Project Cost
$1 million

Owner
Duke Energy

PO Box 1007

Charlotte, NC 28201

Architect
ThermalTech Engineering

3960 Red Bank Road

Cincinnati, OH 45277

Location
424 Gest Street

Cincinnati, OH 45201

The scope of work included the following:

  • Furnished and installed new chiller

  • Rebuilt exiting chiller to manufacturers specification

  • Installed two water pumps, VFDs, operating control system with refrigerant leak detection system